silverFoam

FAQ: How do I check the quality of the spray insulation?

TOOL FOR THE CLIENT

PUR foam insulation calculator

Calculate the approximate cost of PUR foam insulation. Select application, surface and thickness, then send the data to the contractor.

Check the approximate cost of spray insulation and prepare specific data for conversation with the contractor. Select the application site, specify the actual area of the spray and the thickness variant.

You don't have to choose the type of foam yourself – the calculator assigns the system to the indicated application. The final selection of material and thickness should be confirmed for the design and conditions of a specific building element.

Valuation calculator

Calculate the estimated cost of PUR foam insulation

Choose the application, area and insulation thickness. The result updates automatically and helps you prepare for a conversation with a certified silverFoam contractor.

Calculation time 2 min
Area range 10-500 m²
Result forks
1. Where do you want to use isolation?
2. Enter a surface
m²
3. Select insulation thickness
4. Foam type

The type of foam is selected automatically for the selected application.

HOW TO READ THE RESULT

Cost forks instead of one seemingly exact amount

The PUR foam insulation calculator shows the indicative cost range of the material with the application. The result is based on the selected application, surface and thickness variant.

Two buildings with the same area may require different preparation, number of security measures and working time. Therefore, a range is a fairer starting point than a single amount without knowledge of the object.

FROM EXTERMINATION TO OFFER

Three tiers of accuracy

01

Indicative result

A fast budget calculated on the basis of the data given in the calculator.

02

Verification of scope

Photos, design and conversation allow you to check your assumptions.

03

Contractor’s offer

Binding price after confirmation of technology and working conditions.

COST OF PUR FOAM IMPROVEMENT

What influences the final price of implementation?

The rate per square meter alone does not describe the entire order. When comparing quotes, make sure they cover the same product, thickness and complete scope of work.

01

Foam type and thickness

The system and the designed layer should result from the structure, arrangement of the building element and the expected effect.

02

Actual surface area

What matters is the size of the surfaces intended for spraying, and not only the usable area of the rooms.

03

Geometry and details

The scythes, corners, installations and places difficult to access affect the pace and organisation of the application.

04

Ground state

The substrate must meet the system requirements. Additional preparation or removal of existing layers changes the scope of work.

05

Security of the building

Windows, installations and finished surfaces require agreed protection before the spray starts.

06

Access and logistics

The location, height of work, location of equipment, size of the order and deadline affect the organisation of project.

EXECUTIVE ASSESSMENT

Five information to be provided by the contractor

The better you describe the investment, the faster the contractor will assess the scope and indicate whether an inspection is needed.

01

Type of bulkhead

Attic, roof, wall, ceiling, floor, foundation or other range.

02

Spray meter

The surface of all the surfaces on which foam is to be found.

03

Photos and design

Overall view, details, installations, restricted access areas and – if present – a cross-section of the building element.

04

Building condition

Moisture, existing layers, stage of work and elements that are already finished.

05

Place and time limit

Locality, planned completion date and schedule of work of the remaining teams.

GOOD OBSERVATIONS TO BE CALCULATED

The calculator sorts out the data. The contractor confirms the terms.

The approximate result is most useful when the area and location of application correspond to the actual spray range.

CALCULATOR CONSIDERS

The data you give on the page

  • place of application of spray insulation
  • surface of the planes to be sprayed
  • selected layer thickness variant
  • foam system assigned to a particular application

THE CONTRACTOR CHECKS

Conditions for a particular investment

  • design, geometry and number of difficult details
  • condition, humidity and substrate preparation
  • access, working height and logistics on construction
  • the scope of the securities, the time limit and the conditions for receipt

It is only after this verification that a binding offer can be created.

QUESTIONS ABOUT THE CALCULATOR

The most common questions before sending a valuation

FAQ

01

Is the result of the calculator a commercial offer?

No. The result is indicative and helps you plan your budget. A binding quote is created after confirming the scope, construction, surface preparation, access and application conditions.

02

Why does the calculator show a price range?

Facilities of similar size may differ in geometry, substrate condition, number of security measures and logistics. Ranges show this uncertainty better than a single amount calculated without information about the building.

03

Is the floor surface equal to the floor surface?

Usually not. When insulating slopes, the area of ​​slopes and other surfaces intended for spraying is taken into account. This area may be larger than the floor area.

04

What if I do not know the proper thickness of insulation?

Select the variant only for preliminary calculation and send the contractor the design or cross-section of the building element. The target thickness should result from the required thermal parameters, product properties and the arrangement of all layers.

05

Can I upload the result of the calculation to the contractor?

Yes. The button next to the result transfers selected parameters to the query, and the drop-down form allows you to immediately provide contact details and a description of the scope of work.

06

Does the calculator include preparation and security?

They are not priced individually because they depend on the condition and organisation of a specific construction site. The contractor should indicate in the offer what the preparation of the subfloor, covering, cleaning and acceptance of the layer includes.

CONFIDENT OF THE ESTABLISHMENT

Do you have a score? Take the next step to accurate valuation.

Provide the location, photos and a short description of the building element. The contractor will verify the scope, selection of technology and project conditions.