Krakow, Lesser Poland Voivodeship. Scope: insulation of roof slopes and processing of service penetrations. Area approximately 142 m², insulation: open-cell foam.
In Krakow, we performed spray insulation of the attic in a newly built energy-efficient house. We used silverFoam Ag40 open-cell PUR foam, and the application was preceded by an assessment of the substrate and an analysis of places exposed to thermal bridges. In a building with low energy demand, it is the details, not the layer thickness itself, that determine the achievement of the designed parameters.


Illustrative photos.
Scope of work
Parameters
- Working area: About 142 m².
- Type of insulation: open-cell foam, λ = 0,038 W/(m·K).
- Specified layer thickness: 30 cm.
- Thermal transmittance: U = 0,12 W/(m²·K), against the 0,15 requirement under WT 2021.
- Main scope: insulating the roof slopes, including the areas around service penetrations.
Project challenge
An energy-efficient house needs not only a low U-value for its building-envelope elements, but also airtightness throughout the building. Leaks around the wall plate or service penetrations can undermine the effect of thick insulation and reduce heat-recovery performance in a mechanically ventilated building.
Before spraying, we verified the moisture content and stability of the substrate, access to construction details and the locations of potential bridges. Thanks to this, we have planned the application in such a way as to maintain the continuity of the insulation and limit subsequent corrections.
Application process
After protecting windows and doors and the services, we applied the foam in layers, checking its even expansion and the junctions at the wall plate, rafters, floor structure and service penetrations. The foam fills the space without gaps against the structure, which directly affects performance in an energy-efficient building. We visually inspected the surface and filled in the critical areas before handover.
Outcome for the client
The specified thickness of 30 cm achieved a U-value of 0.12 W/(m²·K), comfortably below the required 0.15. Airtightness was confirmed by a blower door test: n50 = [X,X] h⁻¹, compared with the recommended 1.5 h⁻¹ for buildings with mechanical ventilation.
We obtained continuous insulation of the roof and prepared the attic for the installation of vapour barriers and boards. In the case of open-cell foam, a tight vapour barrier is a condition for the durability of the system, which is why the investor received recommendations regarding ventilation, lining and documentation of the layers before closing them.
Key points to remember
- The result depends on continuous insulation and airtightness, rather than on the stated thickness alone.
- A good project starts with checking the substrate, rather than with spraying.
- The details matter most: corners, roof-slope junctions, service penetrations and areas around structural elements.
- An airtightness test should be planned before the building-envelope elements are closed up.