Rzeszów, Subcarpathia. Scope: insulation of slopes and knee walls. Area approximately 83 m², insulation: silverFoam Ag40 open-cell foam.
Rzeszów, Subcarpathia. Residential segment, attic, approximately 83 m². The work was performed by silverFoam Certified Contractor. Our Certified Contractors operate throughout Poland in accordance with our silverFoam Standard quality program.




Illustrative photos.
Scope of work
Parameters
- Working area: approximately 83 m².
- Type of insulation: open-cell silverFoam foam.
- Specified layer thickness: 21 cm.
- Main scope: insulating the roof slope and knee walls.
Preparation
Before starting the work, the Contractor checked the moisture content and stability of the substrate, the condition of the roof membrane and access to all zones covered by the scope. The woodwork, installations and finishing elements were secured.
Work process
The spray was performed in layers, with the uniformity of foam growth controlled. First the roof slope, then the knee walls.
Attention was paid to the joints at the wall, the junction between the walls and the ceiling, and installation transitions – these are places where the cut materials leave gaps. The foam fills them without any adjustments or joints.
After application, the surface was visually checked and critical parts were completed before handing over the facility to the investor.
Outcome for the client
The attic received a uniform layer of insulation, running through the slope, knee walls and contact zones without gaps at the joints. The light material does not add weight to the structure.
The investor received recommendations regarding further stages of work, especially ventilation, lining and documenting the layers before closing them.
Key points to remember
- It is worth determining the scope before starting work – knee walls and contact zones are as important as the surface itself.
- The details matter most: the wall plate, service penetrations and junctions between building-envelope elements.
- Photographs taken during the work are useful for final inspection and acceptance and for the later finishing stages.