PUR FOAM AND POLYUREA EQUIPMENT
The aggregate is the centre of the set. The quality of work is determined by the whole configuration.
Complete application facilities cover much more than the dispensing device itself. The generator, heated hoses, gun, drum pumps, agitators, compressor and power supply must work with the material and the way the crew works.
We start the selection with applications, required performance, mobility and available media. Thanks to this, the configuration corresponds to real implementations instead of a random combination of components.
WITHOUT ABBREVIATIONS
Three Questions Before Offer
01
What are you applying?
PUR foams, polyureas and required proportions and operating parameters.
02
Where do you work?
Houses, halls, roofs, foundations and the distance of the aggregate from the spray zone.
03
How does your team work?
Planned performance, transport, power supply and station organisation.
COMPLETE WORKING PLAN
Elements to be selected as a single system
Compatibility and operating conditions are more important than the number of devices on offer. Each element should result from the material, scale of project and method of operation.
01
Spray aggregates
Hydraulic or pneumatic devices selected according to the material, expected performance and required pressure.
02
Preheated snakes
Length, heating power, braid strength and way of running the wires on the construction site.
03
Spray guns
Compatibility with the system, type of mixing chamber, ergonomics and access to consumables.
04
Pumps and stirrers
Stable administration of barrel components and preparation of material according to system requirements.
05
Air and power
Compressor, generator and electrical installation tailored to the needs of the entire set.
06
Mobile housing
Arrangement of devices in a car or trailer, taking into account access, transport and winter conditions.

TECHNICAL CRITERIA
How to choose an aggregate for the way it works?
A mobile team constructing attics has different requirements, a company working on foundations has different requirements, and a contractor implementing large facilities or polyurea applications has different requirements.
- type of material applied and proportions of components required
- expected performance and operating pressure range
- access to adequate supply and compressed air
- planned length of hoses and distance from spray site
- means of transport, construction and storage
- availability of operating parts, diagnostics and service
FROM NEED TO MOVING
How is the configuration of the set progressing?
The selection should end with a coherent working arrangement and clear rules of daily operation, not just a list of products.
01
Identifying Needs
Materials, typical realizations, expected productivity, team and budget.
02
Back-up audit
Equipment, power supply, compressor, transport and organization of the workplace.
03
Configuration
Aggregate, hoses, gun, pumps, stirrers and auxiliary equipment.
04
Offer and availability
Confirmation of the scope, compatibility, delivery date and purchase conditions.
05
Start
Discussion of service, daily controls, cleaning and reducing the risk of downtime.
BEFORE TALKING TO ADVICE
Prepare data to speed up selection
If you're upgrading from an existing kit, photos of nameplates and components help you assess compatibility without the guesswork.
01
Materials and applications
Show what you want to apply and on which partitions and objects you work most often.
02
Meters and performance
Specify the typical execution size, number of orders and expected daily performance.
03
Media and transport
Describe the available power supply, compressor and car or trailer construction plan.
04
Owned set
Upload models, serial numbers and photos of items to remain in configuration.
EQUIPMENT + SERVICE
Purchase of the device is the beginning of operation
Regular inspection, proper cleaning, a stock of wearing parts and access to diagnostics help reduce costly downtime during the season.
QUESTIONS ON EQUIPMENT
FAQ: PUR foam application equipment
FAQ
01
Are you helping to pick out the whole set, not just the aggregate?
Yes. The starting point is the application and operating conditions, and the configuration may include a generator, hoses, gun, pumps, mixers, compressor, power supply and building elements.
02
Can you expand your equipment?
In many cases, yes. First, you need to determine the device models, their condition, component compatibility and the purpose of modernization. Only then can the scope of changes be reliably determined.
03
Is one configuration suitable for PUR foam and polyurea?
This should not be assumed without verification. The required parameters depend on the material and its documentation, so the application must be confirmed before selecting the device and accessories.
04
How do I get an offer for equipment?
Send a description of the planned work, equipment, performance requirements and transport conditions. The advisor will collect the missing data needed to prepare the configuration.
Select equipment for your team
Describe the type of project, your facilities and the equipment you are looking for. We will come back with questions needed to prepare the configuration.
01
A brief description of the scope of the work and location.
02
Return contact with the next step.
Would you rather call? +48 722 330 300