OVERVIEW AND CONDITIONS
Is PUR foam the right solution here?
The proximity of water increases air humidity and the risk of condensation and corrosion. Foam can insulate dry building envelopes, but it does not replace coatings intended for permanent contact with water.
Good project begins with an assessment of the structure and conditions, not just the square footage. The product, thickness and method of protection of the layer should be described before work begins.
KEY DECISIONS
What do you need to confirm?
01
Separation state
Substrate, existing layers, humidity and places to be repaired.
02
System selection
Type of foam and thickness resulting from the design and expected effect.
03
Layer protection
The method of protecting foam and reception from the next stage of construction.
BENEFITS OF WELL-DESIGNED SPRAY INSULATION
What can be achieved in the correct execution?
The effect depends on the complete building element system, material parameters, surface preparation and application quality.
01
Continuity of insulation in dry technical zones
Continuity must also be checked on connections to adjacent bulkheads.
02
Ability to accurately perform metal construction details
Corners, transitions, installations and restricted access areas require the most attention.
03
Selection of the system with regard to the moist environment
The correct effect depends on the product, the thickness and the conditions of the application.
04
Clear separation of thermal insulation from water protection
Confirm the scope of work and the final inspection procedure in the quotation before spraying begins.

PLACE OF APPLICATION
Where is this solution being considered?
The scope should be described by a specific plane and its layers. The same name of a room may mean a completely different structure and working conditions.
- service and storage buildings of marinas
- dry technical zones
- roofs and walls of sheet metal
- ground partitions exposed to humid air

PRODUCT SELECTION
What kind of foam to choose?
In demanding but dry technical areas, closed-cell foam may be considered. The substrate must be dry, stable and protected against corrosion, and the finished layer must be properly protected.
Border condition: PUR foam is not a coating for constant immersion and does not replace water protection.
STANDARD OF IMPLEMENTATION
From recognition to isolation reception
Each stage reduces a different risk. The layer should not be covered until the agreed details have been checked.
01
Recognition
Construction, humidity, access, installations, existing layers and expected effect.
02
Preparation
Stable, clean and properly dry substrate and environmental protection.
03
Application
Controlled spray parameters, layer work and current continuity control.
04
Over.
Check details, agreed thickness and documentation before further work.

IMPLEMENTING RISK
What's not to miss?
The most common problems result from rushing the preparation or covering the insulation without inspecting it. Discuss these points with the installer.
- mixing of insulation with coating for continuous immersion
- spray on corroded or moist metal
- lack of control of ventilation and dew point
- leaving foam unprotected in the UV zone
EVALUATION PREPARATION
What should I give the contractor before the first conversation?
A few specific pieces of information are enough to distinguish a simple project from an object that requires an inspection or additional documentation.
01
Location and time limit
Locality, stage of construction and planned date of construction and insulation cover.
02
Photos of the whole surface
View of partitions, substrates, difficult details, installations and places with limited access.
03
Actual metres
Surface area of the planes intended for spraying, not just the usable surface.
04
Design and Layers
Separation section, type of structure, existing insulation and expected effect.
QUESTIONS BEFORE EXCLUSION
The most common questions: marina objects
FAQ
01
Is PUR foam suitable for this use?
In demanding but dry technical areas, closed-cell foam may be considered. The substrate must be dry, stable and protected against corrosion, and the finished layer must be properly protected. The final decision should be confirmed based on the design, substrate condition and documentation of the specific system.
02
What do you need to check before you spray?
The most important are: moisture source, dew point, ventilation, corrosion and the possibility of periodic flooding. The contractor should also confirm the temperature, access and scope of protection of elements that will not be covered with foam.
03
What does PUR foam replace in this bulkhead?
PUR foam is not a coating for constant immersion and does not replace water protection.
04
What to send to the preliminary valuation?
Provide the city, approximate spray application area, building type and planned date. Include photos of the entire building element, details, installations and existing layers.
05
What is the final price?
From the surface and thickness of the layer, type of system, geometry, condition of the substrate, access, number of protections, required foam protection and organisation of work on the facility.
QUOTE FOR A SPECIFIC BUILDING ELEMENT
Show contractors real investment conditions.
Send photos, location and square footage. The silverFoam contractor will verify the selection of the system, preparation of the substrate and the scope needed for the offer.